Samatlar Hes Projesi
← Projects











Kastamonu
Belonging to 1461 Trabzon Elektrik Üretim A.Ş., located at İğdir locality in Araç district, Kastamonu, on the Araç River, the Samatlar Regulator and HPP consists of an 11,800-meter open (trapezoidal) canal water transmission structure and 3 Francis-type turbines, with a total capacity of 6.030 MWm / 5.783 MWe and an annual production capacity of 17.712 GWh. It began operating on 27.12.2016. The generated energy is transmitted via a 36 kV transmission line to the Araç substation. It is within the scope of YEKDEM.